• Company: advertising agency, recently
expanded and requires larger office space.
• Personnel: 42 people, including 2 directors, 6 account
managers, 28 account executives,
1 receptionist and 5 administrators.
• Size: 4000sq ft
• Budget: £200,000
|
|
|
| |
Space
Plan
An open plan office space was selected for this
advertising agency, in line with its relatively flat structure.
The design includes: |
| |
- Light and airy space with windows and balconies to
create ergonomically sound office environment.
|
- A large, comfortable reception area was chosen as the
office had no requirement for separate front and back
office designs.
|
- Accessible via stairway and lift to enable any person
to physically access the office with ease.
|
- Two emergency exits in line with government regulations.
|
- Two private offices for the directors.
|
- Desk clusters of between 3 and 6 for the
remaining staff, accommodating the need for teamwork,
and allowing computer and electronic cabling to be efficiently
housed. These are fully adjustable so that more clusters
can be added or expanded on to accommodate future growth
of the agency.
|
- Five meeting rooms of differing sizes to accommodate
both internal meetings and those with clients.
|
- Only two main storage areas were required as most of
the agency’s work is stored electronically.
|
- Private bathroom facilities were selected for the office,
including facilities for people in wheelchairs.
|
- Simple orange and blue colours were chosen to reflect
the agency’s branding, but also to keep the style
of the office simple so that it doesn’t become quickly
outdated.
|
- Each desk is fitted with an adjustable monitor arm for
its computer so that employees can adjust the screen to
the most comfortable distance and height based on their
individual requirements.
|
|
| |
Brief breakdown of budget
|
|
|
|
| |
| |
Category |
Item |
Qty |
Cost |
| |
Preliminaries |
Site condition surveys
Statutory Regulations*
Plan charge (Tower Hamlets)
Building regulation inspection charge*
Notice to Building control
Health & safety*
CDM*
Contract Administration
O&M manuals
Labourer |
-- |
-- |
| |
|
| |
Cleaning |
Cleaning |
|
|
| |
Strip Out |
Carpet Removal
Vinyl Removal
Ceramic Floor tiles
Dry line stud partitioning
Plasterboard ceilings
Tile and Grid ceilings
Kitchen |
-- |
-- |
| |
Buildworks |
Site protection during works
Disposal of building waste during project
Floor Penetrations for Services
Wall Penetrations for Services
Fire Stopping Floors
Fire Stopping Walls |
-- |
-- |
| |
Internal Partitions |
Dry line stud partitioning
Hot water unit to teapoint
Floor Penetrations for Services
Wall Penetrations for Services
Fire Stopping Floors
Fire Stopping Walls
Floor Chasing
Curved stud partition
Curved stud partition |
-- |
-- |
| |
Raised Floors |
Computer floor
Access floor
Cavity Barrier
Access floor ramps
Ramp handrails
Floor box cut-outs |
-- |
-- |
| |
Glass Partitions & glass doors |
Glass Partitions
Single glass doors
Double glass doors
Glass door locks
Double sliding door
Double sliding door
Timber framed glass partitions
Matching timber veneer doors |
-- |
-- |
| |
Ceilings |
Suspended plasterboard ceiling
Suspended plasterboard ceiling under 50m2
Access panel
Exposed grid and mineral fibre tile ceiling
Grid and metal tile ceiling |
-- |
-- |
| |
Doors |
Maple timber veneer doors
Double Doors - Standard white finish. 1hr fire rated
Installation of single doors |
-- |
-- |
| |
Joinery |
Tea point
Reception desk
Appliances
Appliances
Breakfast bar
Storage Wall - Veneer finish
Storage Wall - Melamine finish
Cheery veneer overhead shelf
Operable wall |
-- |
-- |
| |
Decorations |
Decorate new partitions
Feature colours to new and existing walls
Preparation to existing walls
Decorate existing doors
Spray existing ceilings |
-- |
-- |
| |
Wall finishes |
Vinyl wall covering
Supply ceramic wall tiles
Install ceramic floor tiles
Wall tiles
Timber wall panels |
-- |
-- |
| |
Floor finishes |
Carpet tiles installation
Carpet tile supply
Vinyl floor preparation
Vinyl flooring
Vinyl installation
Ceramic floor preparation
Ceramic floor tiles
Floor tile installation |
-- |
-- |
| |
Window treatments |
Manifestation
Curtains
Roller Blinds
Venetian blinds |
-- |
-- |
| |
Signage |
Safety, Fire and Exit signs
Corporate signage |
-- |
-- |
| |
|
|
|
|
| |
|
|
Total: |
£ 200,000 |
|